How long does concrete take to dry? The answer depends on temperature, humidity, mix design, and the type of concrete used. This chart breaks down walkable, load-bearing, and fully cured times for driveways, patios, foundations, and polished concrete.
Concrete Type | Walkable | Light Loads (Cars, Foot Traffic) | Heavy Loads (Trucks, Machinery) | Full Strength (Cured) |
---|---|---|---|---|
Standard Concrete (Driveways, Patios) | 24-48 hours | 7 days | 28 days | 28-56 days |
High-Strength Concrete (Commercial, Industrial) | 24-48 hours | 5-7 days | 21 days | 28 days |
Fast-Setting Concrete | 2-4 hours | 24 hours | 7 days | 14-28 days |
Polished Concrete Floors | 48-72 hours | 10-14 days | 21-28 days | 28-56 days |
Concrete Foundations | 48-72 hours | 7-10 days | 28 days | 56+ days |
Our team of experts is ready to transform your floors with precision and craftsmanship. Don't settle for ordinary when you can have exceptional. Contact us now for concrete floors in England and Wales by emailing us at info@britishconcretepolishing.co.uk or by filling in the form below and our team will get back to you shortly.