Laying slabs on ballast is a popular method for building durable patios, pathways, and outdoor spaces. Ballast provides a strong, free-draining base that supports the slabs and prevents shifting over time. However, getting the right depth, compaction, and technique is essential to avoid uneven surfaces or sinking slabs. This guide walks you through the best method for laying slabs on ballast, common mistakes to avoid, and why proper preparation makes all the difference.
The first step is to dig to the correct depth based on the thickness of the slabs and the type of load they will support. Generally, a depth of 150-200mm (6-8 inches) is recommended for patios and walkways, while driveways may need deeper excavation. Once the ground is dug, remove any organic material, debris, or loose soil, as these can cause sinking or shifting later. The key is to create a firm, stable base, which is why compacting the sub-base is crucial. Use a plate compactor or hand tamper to compress the soil, ensuring there are no soft spots. If the ground is prone to poor drainage, adding a layer of crushed stone or permeable membrane beneath the ballast can help prevent water pooling and movement issues over time.
Once the ground is prepared, spread a layer of ballast evenly across the excavated area. Ballast is a mix of coarse stone and sharp sand that provides a solid, load-bearing base for the slabs. The ideal thickness for the ballast layer is 50-100mm (2-4 inches), depending on slab size and expected traffic. After spreading, use a rake and spirit level to ensure the ballast is evenly distributed. Next, compact the ballast using a wacker plate or tamper to remove air pockets and increase stability. A well-compacted ballast layer prevents slabs from sinking or shifting over time. Check for levelness throughout the process, as an uneven base can lead to cracked or unstable slabs. If additional support is needed, a second compacted layer can be added for extra reinforcement.
There are two main ways to lay slabs on ballast: the dry method and the wet method. The dry method involves laying slabs directly on the compacted ballast, ideal for areas with good drainage and minimal movement. This method makes adjustments easier and allows water to drain naturally. However, slabs may shift slightly over time without mortar to hold them in place. The wet method uses a cement mortar mix (typically 4:1 sand to cement ratio) spread over the ballast to provide extra adhesion. This is ideal for high-traffic areas, driveways, and heavy loads, as it helps keep slabs firmly in place. When using the wet method, apply a 10-15mm mortar bed beneath each slab before positioning it. The method you choose depends on the intended use, ground conditions, and desired durability.
Start by positioning the first slab at one corner of the area, using a string line or level to keep it straight. Carefully lower each slab into place rather than sliding it, as dragging can disturb the ballast underneath. Use a rubber mallet to gently tap the slabs into position, ensuring they sit flush and level with each other. Leave a gap of 5-10mm between slabs to allow for expansion and jointing material. For larger slabs, a two-person lift may be necessary to prevent cracking or improper placement. Check levels as you go, making adjustments by adding or removing small amounts of ballast under each slab. Once all slabs are laid, walk across the surface lightly to test for movement—if any slabs feel unsteady, adjust the ballast or mortar beneath them.
After laying the slabs, ensure they are firmly set and level before moving on to the finishing stage. If using the dry method, sweep kiln-dried sand or fine gravel into the joints to lock the slabs in place. For the wet method, apply a strong mortar mix between the slabs using a pointing trowel, ensuring a weatherproof seal. If extra durability is needed, use a jointing compound to provide added protection against weeds and erosion. Once the joints are filled, lightly compact the slabs again using a rubber mallet to ensure everything is set properly. Finally, hose down the area to settle the material and remove excess dust. Allow the slabs to fully settle for 24-48 hours before heavy use. Proper jointing and compaction ensure your patio or driveway remains strong and stable for years to come.
Our team of experts is ready to transform your floors with precision and craftsmanship. Don't settle for ordinary when you can have exceptional. Contact us now for concrete floors in England and Wales by emailing us at info@britishconcretepolishing.co.uk or by filling in the form below and our team will get back to you shortly.